The installation of a fuel tank should meet the necessary building regulations requirements.

If the installation is above ground the requirements will be applied to achieve adequate shielding of the tank from any surrounding fire and, in the case of an oil tank, containment of oil leakages so that groundwater is not contaminated.

Where new oil connecting pipework is proposed, a fire valve will be needed at the point where the pipe enters the building.

If you are installing an oil tank and/or connecting pipework and you employ an installer registered with one of the related competent person schemes, you will not need to involve a Building Control Service.

Read more about Competent Person Schemes on Gov.uk1

General guidance on the performance expected of materials and building work in order to comply with the building regulations and practical examples and solutions on how to achieve compliance for some of the more common building situations can be found in the approved documents section.

Approved documents

Find a Trade Professional

Use our partner directories from CIAT, FMB or RTPI to find an chartered architectural technologist, builder or planning consultant to help with your project or development.

Find a professional


Useful links

Make an application Planning consultancy calculator
    1. https://www.gov.uk/building-regulations-competent-person-schemes

    The Planning Portal is delivered by PortalPlanQuest Limited which is a joint venture between TerraQuest Solutions Limited and the Department for Levelling Up, Housing and Communities (DLUHC). All content © 2024 Planning Portal.

    The Planning Portal is delivered by PortalPlanQuest Limited which is a joint venture between TerraQuest Solutions Limited and the Department for Levelling Up, Housing and Communities (DLUHC). All content © 2024 Planning Portal.