Biomass Fuelled Appliances

Planning Permission

Planning permission is not normally needed when installing a biomass system in a house if the work is all internal. The installation of a flue outside is normally permitted development, unless it affects the roof line, at which point planning permission should be sought.

Disclaimer - Wales

This is an introductory guide and is not a definitive source of legal information. This guidance relates to the planning regime for Wales. Policy in England may differ. If in doubt contact your Local Planning Authority.

Read the full disclaimer here.