Skip to content

Building regulations: Conversion projects

When converting areas to liveable space then it is likely that any existing roof needs to be checked for adequacy in terms of weather resistance and thermal insulation.

If the underside of the roof (the ceiling) is to be lined with plasterboard then the resulting void may also need to be ventilated.

Flat roofs

The roof will need to be ventilated. Typically, a 50mm gap should be maintained between any insulation and the underside of the roof. Through ventilation is then achieved by incorporating eaves venting. 

If the roof is to be re-covered then the insulation can be installed on top of the joists making a ‘warm deck’ roof (check with manufacturers for details). This avoids the need for ventilation and the roof covering can be re-applied over the top.

Pitch Roofs

Insulation can be placed between the ceiling joists. Again, the thickness will vary depending on the material you choose to use.

If the roof has no ceiling then the insulation can be placed between the rafters and ventilation maintained as described above - in which case the ridge should also have vent tiles installed to allow for through ventilation.

Search and find

Find a professional RTPI Directory of Planning Consultants Find your building control authority


Useful links

Make an application Speak to an expert Studio Charrette consultancy calculator Sell your site with Land Match

      The Planning Portal is delivered by PortalPlanQuest Limited which is a joint venture between TerraQuest Solutions Limited and the Ministry of Housing, Communities & Local Government (MHCLG). All content © 2025 Planning Portal.

      The Planning Portal is delivered by PortalPlanQuest Limited which is a joint venture between TerraQuest Solutions Limited and the Ministry of Housing, Communities & Local Government (MHCLG). All content © 2025 Planning Portal.